首页> 外文期刊>U.S. Coal Review >Cloud Peak Energy battles floods, picks up reserves during busy second quarter
【24h】

Cloud Peak Energy battles floods, picks up reserves during busy second quarter

机译:云峰能源与洪水抗争,在繁忙的第二季度增加储备

获取原文
获取原文并翻译 | 示例
           

摘要

Cloud Peak Energy is sold out for 2011, will average 12.91 dollars/ton for the year and already has 81 million tons under contract for 2012. But the spring showers that brought May flowers also brought some headaches for Cloud Peak and the other producers in the Powder River Basin. Cloud Peak reported its second quarter earnings and had a net income of 94.6 million dollars during the quarter and 121.4 million dollars for the first six months of the year. The company said the highlight of the quarter was successful bids on the West Antelope II North and South coal tracts that have over 400 million tons of mineable reserves.
机译:Cloud Peak Energy在2011年售罄,平均价格为每吨12.91美元/吨,2012年已经签订了8,100万吨的合同。但带来五月鲜花的春季阵雨也给Cloud Peak和其他生产商带来了麻烦。粉末河流域。 Cloud Peak报告了其第二季度收益,该季度净收入为9460万美元,今年前六个月的净收入为1.214亿美元。该公司表示,本季度的亮点是成功竞标了拥有超过4亿吨可采储量的西羚羊II北部和南部煤区。

著录项

  • 来源
    《U.S. Coal Review》 |2011年第1867期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号