...
首页> 外文期刊>U.S. Coal Review >Yes it's a longer-term story marred by obstacles, but PRB exports likely to flower
【24h】

Yes it's a longer-term story marred by obstacles, but PRB exports likely to flower

机译:是的,这是一个长期的故事,充满障碍,但PRB出口可能开花结果

获取原文
获取原文并翻译 | 示例
           

摘要

For those who can patiently envision it as a long-term play that will require several years to jump start and take maybe even longer to prosper in a big way, Powder River Basin coal export business might be a strategy that pays handsomely for key Western producers. All of the enthusiastic discussion about PRB coal's potential into the Asian market by Arch Coal, Peabody Energy and others might have become a wearisome topic for those who doubt the lower-Btu products will thrive in big volumes as an overseas venture. There are daunting barriers that will make the process of establishing significant business a slow and painful process; transportation costs, low heat content of the coal and the much-discussed opposition by environmental groups to all things coal, which means fierce battles over proposals for new West Coast ports.
机译:对于那些可以耐心地将其看作是一项长期工作的人来说,这需要几年的时间才能起步,甚至可能需要更长的时间才能取得长足的繁荣,粉河盆地的煤炭出口业务可能是一项为西方主要生产者付出丰厚回报的战略。对于那些怀疑低Btu产品作为海外企业会蓬勃发展的人们来说,Arch Coal,Peabody Energy等对PRB煤炭进入亚洲市场潜力的所有热烈讨论可能已经成为令人厌烦的话题。艰巨的壁垒将使建立重要业务的过程缓慢而痛苦。运输成本,煤炭含热量低以及环保组织对所有煤炭问题的广泛讨论,这意味着就新的西海岸港口的提议进行激烈的战斗。

著录项

  • 来源
    《U.S. Coal Review》 |2011年第1850期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号