首页> 外文期刊>U.S. Coal Review >Shaw achieves substantial completion of new state-of-art Rodemacher generating units
【24h】

Shaw achieves substantial completion of new state-of-art Rodemacher generating units

机译:邵氏(Shaw)基本上完成了新式Rodemacher发电机组的生产

获取原文
获取原文并翻译 | 示例
           

摘要

The Shaw Group has achieved substantial completion of Cleco Corp.'s new Rodemacher 3 electric generating facility in Boyce, LA. The plant's petroleum coke-fired circulating fluidized bed has been operated at its rated capacity and efficiency and has been released to Cleco for commercial operation. Shaw was awarded the engineering, procurement and construction contract in August 2005 for two new 330-MW state-of-the-art CFB units supplying high-pressure steam to a single 660-MW steam turbine generator.
机译:邵氏集团已经完成了Cleco Corp.在洛杉矶博伊斯的新Rodemacher 3发电设施的建设。该工厂的石油焦燃烧循环流化床已经以其额定容量和效率运行,并已交付给Cleco进行商业运营。 Shaw于2005年8月获得了两台330兆瓦的最新CFB机组的工程,采购和建筑合同,这两个机组可为一台660兆瓦的蒸汽轮发电机提供高压蒸汽。

著录项

  • 来源
    《U.S. Coal Review》 |2010年第1791期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号