...
首页> 外文期刊>U.S. Coal Review >How do you spell delay? Try E-P-A as permits caught in morass of regulatory shortfalls, reluctance
【24h】

How do you spell delay? Try E-P-A as permits caught in morass of regulatory shortfalls, reluctance

机译:您如何拼写延迟?尝试使用E-P-A,因为它陷入了监管不足,勉强的困境中

获取原文
获取原文并翻译 | 示例
           

摘要

There are reports that somewhere between 175 and 200 refuse disposal permits have passed their technical review period without issuance. The continued backlog traces to more than one source. The EPA's involvement has "literally put (the process) in limbo," according to a senior official with one Central Appalachian mining company. The EPA does manage to chill a room. But personnel shortages also appear to be slowing the permit process. There are scads of inexperienced reviewers and shortages of sufficient regulatory personnel, sources said. Further, the Nationwide General Permit expired in January, the EPA wanted 90 days to review it, prior to renewal, and the reviewers "didn't like what they saw," a source noted. Heavy metal analysis was added to the process, "giving them 'outs' for later down the road," a source said.
机译:有报道称,大约有175至200个垃圾处理许可证没有通过其技术审查期。持续的积压可追溯到多个来源。一家中央阿巴拉契亚矿业公司的一位高级官员表示,EPA的介入“实际上使(整个过程)陷入了困境”。 EPA确实使房间变冷。但是人员短缺似乎也正在延缓许可流程。消息人士称,有大量缺乏经验的审查员和缺乏足够的监管人员。消息人士指出,此外,《全国通用许可证》于1月到期,EPA希望在续签前90天对其进行审核,并且审核者“不喜欢他们所看到的内容”。一位知情人士说,重金属分析被添加到该过程中,“让它们“出局”以备后用。

著录项

  • 来源
    《U.S. Coal Review》 |2009年第1767期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号