...
首页> 外文期刊>Quality World >last train to six sigma
【24h】

last train to six sigma

机译:最后一班到六个西格玛

获取原文
获取原文并翻译 | 示例
           

摘要

Nowhere within Network Rail is the drive towards business excellence better enshrined than within the west coast project, which is tasked with carrying out the mammoth multi-billion pound upgrade of the west coast mainline. This project extends from Euston to Glasgow and is aimed at delivering a state of the art railway capable of supporting a more frequent service utilising high-speed tilting trains. The project has, however, been beset with difficulties, which culminated in the original 1997 cost forecast of £2.8bn escalating to £9bn (though now stabilised at £7.6bn). Something needed to be done to get a grip on quality, efficiency and costs.
机译:在Network Rail中,没有比在西海岸项目中更能体现卓越业务的动力了,西海岸项目的任务是对西海岸干线进行数十亿英镑的巨额升级。该项目从Euston延伸到Glasgow,目的是交付一条能够使用高速倾斜火车提供更频繁服务的最先进铁路。然而,该项目一直充满困难,最终导致1997年最初的成本预测从28亿英镑上升到90亿英镑(尽管现在稳定在76亿英镑)。需要采取一些措施来控制质量,效率和成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号