首页> 外文期刊>Pulp & Paper Week >Politics of power: Nova Scotia utility told not to burn biomass at all costs
【24h】

Politics of power: Nova Scotia utility told not to burn biomass at all costs

机译:权力政治:新斯科舍省公用事业告诉不要不惜一切代价燃烧生物质

获取原文
获取原文并翻译 | 示例
           

摘要

The government of Nova Scotia lifted a regulation forcing the province's electricity utility to run its biomass-fueled boiler round the clock to meet renewable energy targets even when it costs more than generating power from other fuels. This means Nova Scotia Power must now take costs into consideration and operate the biomass plant adjacent to Port Hawkesbury Paper's (PHP) supercalen-dered paper (SC) mill on an as-needed basis, a legislative committee decided.
机译:新斯科舍省政府取消了一项法规,迫使该省的电力公司全天候运行其以生物质为燃料的锅炉,以达到可再生能源的目标,即使其成本高于使用其他燃料发电的成本。立法委员会决定,这意味着新斯科舍省电力公司现在必须考虑成本,并在需要的情况下根据需要在港口霍克斯伯里造纸(PHP)超级压延造纸(SC)工厂附近运营生物质工厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号