...
首页> 外文期刊>Proceedings of the Workshop on Principles of Advanced and Distributed Simulation >STRATEGY OPTIMIZATION AND GENERATION FOR CONSTRUCTION PROJECT MANAGEMENT USING AN INTERACTIVE SIMULATION
【24h】

STRATEGY OPTIMIZATION AND GENERATION FOR CONSTRUCTION PROJECT MANAGEMENT USING AN INTERACTIVE SIMULATION

机译:交互式仿真的工程项目管理策略优化与生成

获取原文
获取原文并翻译 | 示例

摘要

Construction activities are exposed to unpredictable external events and internal dynamic feedbacks of constraints which deviate projects from as-planned duration and costs. In practice, various decisions have been used to minimize the impacts of risks. Learning from experiences is valuable which requires historical data collection and analysis. To avoid the high cost in direct data collection and difficulties in studying single decision impacts, we present an alternative to study and optimize decision strategies. Interactive Construction Decision Making Aid (ICDMA) is an interactive simulator which allows users to implement different decision strategies on the defined projects. All the project information and decision data in the simulation are recorded electronically. We started with five candidate strategies and analyzed data for general patterns. New hybrid strategies were generated based on the data analysis. Reimplementation of new strategies showed improvement in cost and duration management, validating the feasibility of strategy optimization through interactive simulation.
机译:施工活动暴露于不可预测的外部事件和约束的内部动态反馈,这些反馈使项目与计划的工期和成本有所偏离。实际上,已使用各种决策来最大程度地降低风险的影响。从经验中学习是有价值的,这需要历史数据的收集和分析。为了避免直接数据收集的高成本和研究单个决策影响的困难,我们提出了一种替代方法来研究和优化决策策略。交互式施工决策辅助工具(ICDMA)是一个交互式模拟器,允许用户对定义的项目实施不同的决策策略。模拟中的所有项目信息和决策数据均以电子方式记录。我们从五种候选策略开始,然后分析了一般模式的数据。基于数据分析产生了新的混合策略。重新实施新策略显示出成本和工期管理方面的改进,通过交互式仿真验证了策略优化的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号