首页> 外文期刊>Proceedings of the Workshop on Principles of Advanced and Distributed Simulation >INTEGRATED EVALUATION OF COST, SCHEDULE AND EMISSION PERFORMANCE ON ROCK-FILLED CONCRETE DAM CONSTRUCTION OPERATION USING DISCRETE EVENT SIMULATION
【24h】

INTEGRATED EVALUATION OF COST, SCHEDULE AND EMISSION PERFORMANCE ON ROCK-FILLED CONCRETE DAM CONSTRUCTION OPERATION USING DISCRETE EVENT SIMULATION

机译:基于离散事件模拟的碎石混凝土坝施工作业成本,工期和排放性能综合评价

获取原文
获取原文并翻译 | 示例
       

摘要

Massive concrete dam projects will be conducted in the next ten years to respond to the increasing demand for clean energy and water resources in developing countries. With more attention paid to environmental issues, there is an increasing need to develop a methodology for reliably predicting the integrated performance of cost, schedule and emission factors in the planning stage. In this paper, we propose a methodology for using discrete event simulation (DES) for dam construction processes to enhance the performance dynamically. A case study is conducted to demonstrate the effectiveness of the DES model, which is validated by the actual cumulative progress on the construction site. The results indicate that the cost, schedule and emission performance are highly interactively correlated when using RFC in dam projects. The promoted methodology could help construction managers compare the integrated performance of different options in RFC dam constructions.
机译:未来十年将进行大型混凝土水坝项目,以应对发展中国家对清洁能源和水资源日益增长的需求。随着对环境问题的更多关注,越来越需要开发一种在规划阶段可靠地预测成本,进度和排放因子的综合绩效的方法。在本文中,我们提出了一种使用离散事件模拟(DES)进行大坝施工过程以动态提高性能的方法。进行了一个案例研究,以证明DES模型的有效性,并通过施工现场的实际累积进度进行了验证。结果表明,在大坝项目中使用RFC时,成本,进度和排放绩效之间存在高度的交互关系。提倡的方法可以帮助施工经理比较RFC大坝施工中不同方案的综合性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号