...
首页> 外文期刊>Process & Plant Engineering >Integrated 3D Models Enable Compact and Safe Plant Design
【24h】

Integrated 3D Models Enable Compact and Safe Plant Design

机译:集成的3D模型可实现紧凑而安全的工厂设计

获取原文
获取原文并翻译 | 示例
           

摘要

Executing gold extraction and processing plant design on schedule enabled project owners to take advantage of high gold prices Nearly nine years after a state-run company ceased operations at the Pueblo Viejo mine in the Dominican Republic, Barrick Gold Corp. is developing a $2.7 billion mining project that will generate more than 1,000 jobs over the gold mine's 25-year lifetime. The new facility will process gold ore at a throughput rate of 24,000 tons per day to produce almost 1 million ounces of gold per year during the first five years of operation.
机译:一家国有公司在多米尼加共和国的Pueblo Viejo矿停止运营将近九年后,巴里克黄金公司正按计划执行黄金提取和选矿厂设计,以利用高昂的金价。巴里克黄金公司正在开发一座价值27亿美元的矿山该项目将在金矿25年的使用寿命中创造1000多个工作岗位。新工厂将在开始运营的头五年中,每天以24,000吨的吞吐量处理金矿石,每年生产近100万盎司的黄金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号