首页> 外文期刊>Platform Oil & Gas Technology Review >Mariner Jacket on its Way to the North Sea
【24h】

Mariner Jacket on its Way to the North Sea

机译:水手夹克通往北海

获取原文
获取原文并翻译 | 示例
           

摘要

The steel jacket for the Statoil operated Mariner A platform on the UK Continental Shelf (UKCS) left the Spanish Dragados yard on the 10th August. 2015. for its final destination on the East Shetland Platform of the UK North Sea. approximately 150 kilometres East of the Shetland Isles. Construction of the large platform substructure started in October. 2013. and was completed in May this year, on time and within budget and with a very good USE performance. 134 metres high and with a footprint of 88 x 62 metres, it is the largest steel jacket ever built for a Statoil project. The weight is 22.400 tonnes, including floatation tanks and rigging.
机译:英国国家大陆架(UKCS)上由挪威国家石油公司(Statoil)经营的Mariner A平台的钢外套于8月10日离开西班牙Dragados船厂。 2015年,其最终目的地是英国北海的东设得兰平台。设得兰群岛以东约150公里。大型平台子结构的建设于10月开始。 2013年完成,并于今年5月按时,在预算内完成,并具有非常好的USE性能。它高134米,占地面积88 x 62米,是有史以来为Statoil项目建造的最大的钢外套。重量为22.400吨,包括浮箱和索具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号