首页> 外文期刊>Platform Oil & Gas Technology Review >STATS Group Successfully Completes 20' Valve Change-Out on the Yanga Platform
【24h】

STATS Group Successfully Completes 20' Valve Change-Out on the Yanga Platform

机译:STATS集团在Yanga平台上成功完成20英寸阀门更换

获取原文
获取原文并翻译 | 示例
       

摘要

Piping technology specialist, STATS Group, has successfully completed a 20" valve change-out on the Yanga platform, offshore the Republic of Congo. The Aberdeen based company was contracted by Halliburton, on behalf of Total E&P, to provide pipeline isolation to replace a launcher valve located downstream between the Yanga export and Sendji production lines.
机译:管道技术专家STATS Group已成功在刚果共和国离岸的Yanga平台上完成了20“阀门的更换。这家总部位于阿伯丁的公司由Halliburton代表Total E&P承包,以提供管道隔离以取代发射阀位于Yanga出口和Sendji生产线之间的下游。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号