...
首页> 外文期刊>Power: The Magazine of Power Generation and Plant Energy Systems >Prepare Your Nuclear Plant for Cold Weather Operations
【24h】

Prepare Your Nuclear Plant for Cold Weather Operations

机译:准备您的核电站以应对寒冷天气

获取原文
获取原文并翻译 | 示例
           

摘要

Nuclear plant structures are designed to withstand extreme cold weather conditions. However, a winterization program, such as those shared by Byron and D.C. Cook power plants, can ensure critical operating systems are prioritized and protected from freezing during low ambient temperature conditions.
机译:核电站的结构旨在承受极端寒冷的天气条件。但是,像拜伦(Byron)和DC库克(D.C. Cook)发电厂共享的防寒程序可以确保在低温环境条件下优先考虑关键操作系统并防止冻结。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号