首页> 外文期刊>plastics information europe >Expansion phase 2 starts off as planned / Polyolefin manufacturing facility in Shanghai is inaugurated
【24h】

Expansion phase 2 starts off as planned / Polyolefin manufacturing facility in Shanghai is inaugurated

机译:扩建二期按计划启动/上海的聚烯烃生产厂落成

获取原文
获取原文并翻译 | 示例
           

摘要

Meeting its planned start-up date of early 2010, Borouge (Abu Dhabi / United Arab Emirates; www.borouge.com) has brought on stream its new olefin plant in Ruwais (UAE). Speaking at a recent press conference, operative business manager Roy Vardheim said it would take between 12-18 months for the world's largest cracker to reach full capacity. "Borouge II" will triple existing capacity of Borouge's petrochemical complex in Ruwais to 2m t/y of PE and PP.
机译:Borouge(阿布扎比/阿拉伯联合酋长国; www.borouge.com)已计划在2010年初启动,现已将其在Ruwais(UAE)的新烯烃工厂投产。运营业务经理Roy Vardheim在最近的新闻发布会上说,这家世界上最大的饼干要达到满负荷状态需要12-18个月。 “ Borouge II”将使Borouge在Ruwais的石化综合设施的现有产能增加三倍,达到PE和PP每年200万吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号