首页> 外文期刊>Plastics Technology >Preventing Water Leaks Part III of III
【24h】

Preventing Water Leaks Part III of III

机译:防止水泄漏III的第三部分

获取原文
获取原文并翻译 | 示例
           

摘要

The pounding could be heard halfway across the plant.As the clock on the wall ticked toward the end of the shift,the repair shop was in high gear assembling several molds that had been pulled for scheduled maintenance.This is the time of the day,appropriately known by some as the "four o'clock slam," when shortcuts are taken and mistakes are made by repair technicians under the gun to get molds back out to production-and go home.No fiddling and fitting here-it's hammer time.
机译:整个工厂的一半都传来敲打的声音。当墙上的时钟在班次快结束时滴答作响时,修理厂就处于高速运转状态,组装了一些已拉出以进行定期维护的模具。通常被称为“四点大满贯”,当捷径出炉,维修技术人员在枪下进行错误操作时,将模具重新投入生产,然后运回家。这里没有摆弄和装配的时间,这是锤击时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号