首页> 外文期刊>Chemical Engineering Research & Design: Transactions of the Institution of Chemical Engineers >Automatic control system for removal of paraffin deposits in oil well in permafrost region by thermal method
【24h】

Automatic control system for removal of paraffin deposits in oil well in permafrost region by thermal method

机译:热法去除多年冻土区油井石蜡沉积的自动控制系统

获取原文
获取原文并翻译 | 示例
           

摘要

Paraffin deposits in oil wells reduce oil production. Paraffin deposits from an oil well can be removed by thermal method using a heating cable. Due to the fact that the oil well is characterized by the number of geothermal energy and oil production, the individual approach to calculating the heating current is required: current must be sufficient to remove the paraffin, but the temperature should not exceed the operating temperature of the cable insulation. The automatic control system for removal of paraffin deposits in oil wells that allowed to predict the optimal value of the current in a heating cable and the minimum time of its work to remove deposits was proposed. This allows us to save energy. (C) 2016 Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.
机译:油井中的石蜡沉积会降低石油产量。油井中的石蜡沉积物可以使用加热电缆通过热方法去除。由于油井的特征在于地热能和石油产量,因此需要采用单独的方法来计算加热电流:电流必须足以去除石蜡,但温度不得超过石蜡的工作温度。电缆绝缘。提出了一种用于清除油井中石蜡沉积物的自动控制系统,该系统可以预测加热电缆中的最佳电流值,并能预测其用于清除沉积物的最短时间。这样可以节省能源。 (C)2016年化学工程师学会。由Elsevier B.V.发布。保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号