【24h】

Feeder fix

机译:进纸器修复

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Time dedicated to cleaning out a vibrating grizzly feeder and prying out rocks wedged between grizzly bars adds up. Especially when work crews must address pegging and plugging issues within a grizzly feeder multiple times per week. Will Pyatt, general manager of Anna Quarries and Kinkaid Stone Co. in southern Illinois, estimates his crew at Kinkaid Stone previously had to address the grizzly feeder within one quarry three to four times per week at the end of shifts. That's time Kinkaid Stone preferred to dedicate to production.
机译:清理振动的给料器和撬起楔在灰棒之间的岩石的时间加起来了。尤其是当工作人员每周必须多次解决灰熊给料机中的钉子和塞子问题时。伊利诺伊州南部Anna Quarries和Kinkaid Stone Co.的总经理Will Pyatt估计,他的Kinkaid Stone船员以前必须在轮班结束时每周一次在三至四次在一个采石场里与灰飞虱接触。那时Kinkaid Stone倾向于致力于生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号