首页> 外文期刊>Pit & Quarry >Pervious parking lots premiere in California
【24h】

Pervious parking lots premiere in California

机译:加利福尼亚州的停车场首次亮相

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

California's first pervious concrete parking lot was recently completed at a park in Fair Oaks, near Sacramento. In addition to pollution prevention and stormwater-management benefits, the light-colored pavement is expected to be 20 to 40 degrees cooler in the summer than black asphalt, according to the California Cement Promotion Council (CCPC).The high-cement-content mix contains no fine aggregate and has a low water/cement ratio. It is delivered in ready-mix trucks and placed in conventional forms. The wet concrete is vibrated and rolled to increase its density and strength.
机译:加州的第一个透水混凝土停车场最近在萨克拉曼多附近的Fair Oaks的一个公园内完工。据加州水泥促进委员会(CCPC)称,除了防止污染和雨水管理方面的好处外,夏季的浅色路面还比黑色沥青凉爽20至40度。不含细骨料,水灰比低。它以预拌卡车交付并以常规形式放置。将湿混凝土振动并碾压以增加其密度和强度。

著录项

  • 来源
    《Pit & Quarry》 |2001年第2期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号