首页> 外文期刊>E3S Web of Conferences >The influence of changes in the project on the reliability of heat power systems during construction and installation works
【24h】

The influence of changes in the project on the reliability of heat power systems during construction and installation works

机译:工程变更对建筑安装过程中热力系统可靠性的影响

获取原文
       

摘要

However, during the construction and reconstruction of existing heat networks, cases that lead to unstable operation of newly laid or replaced areas arise. An important task is to minimize the reasons that can cause damage to replaced areas. Factors that negatively affect the reliability include: laying pipelines without design documentation, non-compliance of the regulatory requirements for their laying by installation organizations. The assumptions of design engineers developing the project and installers laying the heating main can lead to negative consequences, including a decrease in the reliability of the facilities functioning. Physical deterioration, coupled with the above factors, leads to a large number of failures of heat networks. Breakthroughs reduce the reliability of the entire heat supply system, worsen the quality of the supplied coolant and lead to an increase in the cost of maintenance of heat networks by operating organizations. The paper considers the influence of changes in the project during the construction and installation works on the reliability of the heat supply system.
机译:但是,在现有热网的建设和重建过程中,会出现导致新铺设或更换的区域运行不稳定的情况。重要的任务是最小化可能对替换区域造成损坏的原因。对可靠性产生负面影响的因素包括:铺设没有设计文件的管线,安装组织不遵守法规要求铺设管线。设计工程师开发项目和安装供暖管道铺设的假设可能导致负面后果,包括设施运行可靠性的降低。物理性能恶化,再加上上述因素,导致热网大量失效。突破会降低整个供热系统的可靠性,恶化所供应冷却液的质量,并导致运营机构维护热网的成本增加。本文考虑了在施工和安装过程中项目变化对供热系统可靠性的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号