The process timeline for sustainable construction management: case study in the construction of an educational centre

机译:可持续建设管理的过程时间表:教育中心建设中的案例研究

获取原文
       

摘要

Entrepreneurship is hard work, especially when it comes to the creation of an innovative, ecologically correct and sustainable project, and the small entrepreneur, in addition to facing bureaucratic and fiscal obstacles, has great difficulty in running his business, planning and optimizing his production for lack structured management knowledge. This is what happens with the company studied, where the construction of an educational centre, thought to be a model of ecological and sustainable building, did not have a schedule of execution, thus becoming dependent on very short term planning, accomplished at each step, rather than a structured action as a whole. In this sense, the Critical Path Method (CPM), which uses simple estimates for the duration of the building stages and the PERT technique, was implemented among a variety of schedules and methods for planning and control of works execution. This method is suitable and simple to use by small businesses. This methodology, easy to be understood and implemented, generated benefit to the company, allowing planning, predictability and control of the works.
机译:企业家精神是一项艰苦的工作,尤其是在创建创新,生态正确和可持续发展的项目时,小企业家除了面临官僚主义和财政障碍外,在经营,规划和优化生产方面也存在很大困难。缺乏结构化的管理知识。这就是所研究的公司所发生的情况,该公司的教育中心建设被认为是生态和可持续建筑的典范,但没有执行时间表,因此依赖于非常短期的规划,并在每个步骤中完成,而不是整体的结构化行动。从这个意义上讲,关键路径法(CPM)使用了对建筑阶段的持续时间和PERT技术的简单估算,并在各种计划和控制工作执行的时间表和方法中实施了。这种方法适合小型企业,并且易于使用。这种易于理解和实施的方法论为公司带来了好处,可以对工作进行计划,可预测性和控制性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号