机译:ASSESSMENT OF COSTS AND BENEFITS ASSOCIATED WITH RESOLUTION OF GENERIC SAFETY ISSUE 143 - AVAILABILITY OF HEATING, VENTILATION, AND AIR CONDITIONING AND CHILLED WATER SYSTEMS
机译:SLUG IMPACT LOADING ON THE VESSEL HEAD DURING A POSTULATED IN-VESSEL STEAM EXPLOSION IN PRESSURIZED WATER REACTORS - ASSESSMENTS AND DISCUSSION OF THE INVESTIGATION STRATEGY