摘要:World Class Manufacturing,Visual shopfloor planning,Changeover reduction,Golf ball game,Changeover video analysis workshop,Total Productive Maintenance,Visible workplace,The numbers game,Direct line feed,Supplier managed inventory,Standard operating procedures,Visual performance measures。Typically 95% of manufacturing lead-timeis non value added,Is a physical reorderingsystem-linking suppliers&customers。Supplies only the parts thatare required(pull system)。Is controlled by the shopfloor。Visual Shopfloor based scheduling should be used to maximise responsiveness and performance。