首页> 外文期刊>World highways >Concrete Option
【24h】

Concrete Option

机译:具体选择

获取原文
获取原文并翻译 | 示例
           

摘要

Contractor PJ Davidson UK has slipformed more than 1 million linear metres of concrete barrier, curb and drain in the last 14 years. The company passed this incredible milestone in October this year, during a night shift on a motorway widening project in England. While this achievement might be common among US contractors, the company, based in Exeter in Devon, is thought to be one of the only companies of its kind in Europe to hit the 1,000km mark. Davidson purchased its first Gomaco Commander III slipform paver in 1994, having worked as an earthmoving contractor in support of a concrete train. The company now runs a fleet of four Commander HI pavers on projects across the UK and in other European countries.
机译:在过去的14年中,承包商PJ Davidson UK已对超过100万线性米的混凝土屏障,路缘石和排水装置进行了滑模成型。该公司于今年10月在英格兰高速公路拓宽项目的夜班中突破了这一令人难以置信的里程碑。尽管这一成就在美国承包商中可能很常见,但该公司位于德文郡埃克塞特(Exeter),被认为是欧洲同类公司中唯一达到1,000公里大关的公司之一。戴维森(Davidson)于1994年购买了第一台Gomaco Commander III滑模摊铺机,曾作为土方承包商来支撑混凝土火车。该公司目前在英国和其他欧洲国家/地区的项目中运营着四台Commander HI摊铺机。

著录项

  • 来源
    《World highways》 |2008年第9suppla期|p.22-23|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号