...
首页> 外文期刊>World Dredging >Jan De Nul completes Port Hedland dredging
【24h】

Jan De Nul completes Port Hedland dredging

机译:Jan De Nul完成了黑德兰港疏dr

获取原文
获取原文并翻译 | 示例

摘要

Jan De Nul Group completes the capital dredging works for the Channel Risk and Optimization Project (CROP) in Port Hedland, Western Australia, and can look back on a successful three-year cooperation with the Pilbara Ports Authority (PPA). Over the past three years a combination of Hopper Dredge, a Cutter Suction ( CS ) dredge and Split Hopper ( H ) barges were deployed to dredge sections of the 42-km long navigational channel and to further enhance the safe and sustainable access to the port of Port Hedland. The project, part of the Channel Risk and Optimization Project (CROP), included the removal of high spots and the creation of two refuge zones and an emergency passing lane alongside the outer section of the shipping channel.
机译:Jan De Nul集团已完成西澳大利亚州黑德兰港的航道风险与优化项目(CROP)的资本疏works工程,并可以回顾与皮尔巴拉港务局(PPA)的成功三年合作。在过去的三年中,Hopper Dredge,Cutter Suction(CS)挖泥船和Split Hopper(H)驳船相结合,被部署到了42公里长的航道的挖泥区,以进一步增强通往港口的安全和可持续性黑德兰港。该项目是渠道风险和优化项目(CROP)的一部分,包括拆除高点,并在航运通道外部沿线建立两个避难区和一条应急通行车道。

著录项

  • 来源
    《World Dredging 》 |2019年第12期| 24-24| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号