首页> 外文期刊>Travaux >Les ponts-rails de Pantin: Le remplacement de cinq ouvrages au coeur du reseau ferre a la sortie de la gare de I'Est The Pantin railway bridges:
【24h】

Les ponts-rails de Pantin: Le remplacement de cinq ouvrages au coeur du reseau ferre a la sortie de la gare de I'Est The Pantin railway bridges:

机译:Pantin铁路桥梁:更换东站出口铁网中心的五个结构Pantin铁路桥梁:

获取原文
获取原文并翻译 | 示例
       

摘要

The five secular steel decks at Pantin were replaced between 5 July 2003 and 17 August 2003 using an original handling system. The old structures were removed by rail on self-propelled lorries travelling on running beams. Jacking towers enabled the system to be raised or lowered. The new decks were put in place by the reverse process on springers which were completely prefabricated. This project disturbed rail and road traffic for only two months, with effective replacement of the decks in three times fifteen days (i.e. one and a half months).
机译:在2003年7月5日至2003年8月17日之间,使用原始处理系统更换了Pantin的五个世俗钢甲板。老式结构被铁路上的自走式货车在横梁上行驶时拆除。升降塔使系统得以升高或降低。通过完全预制的弹跳器的逆向过程将新的甲板放置到位。该项目仅两个月就扰乱了铁路和公路交通,并在十五次三天(即一个半月)内有效更换了甲板。

著录项

  • 来源
    《Travaux》 |2003年第803期|p.81-87|共7页
  • 作者

    J.-Cl; Gincourt; D. Keller;

  • 作者单位

    SNCF -Direction de Paris Est-Division Maintenance Ingenierie;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 fre
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:19:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号