...
首页> 外文期刊>Travaux >EXCAVATED MATERIAL FOR THE 'GRAND PARIS EXPRESS': A 45 MILLION TONNE CHALLENGE
【24h】

EXCAVATED MATERIAL FOR THE 'GRAND PARIS EXPRESS': A 45 MILLION TONNE CHALLENGE

机译:“巴黎特快专递”的挖掘材料:4,500万吨的吨挑战

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Over about ten years, the 'Grand Paris Express' metro project will produce 45 million tonnes of excavated material, consisting for 95% of uncontaminated natural soils. Société du Grand Paris, assisted by Artémis, has since 2012 developed an exemplary operational strategy for management of excavated material. In the current regulatory environment, excavated material has the status of waste. The management strategy comprises three main features: traceability of earth, recycling of materials, and mitigation of environmental nuisances by the optimised use of river and rail transport. A significant role is reserved for innovation and the development of specific contractual tools and techniques. The start of work on the contracts for Line 15 South will allow continuous improvement of the strategy of Société du Grand Paris.
机译:在大约十年的时间里,“大巴黎快车”地铁项目将产生4500万吨的挖掘出的物料,其中95%是未污染的天然土壤。自2012年以来,在Artémis的协助下,巴黎大社会银行(Sociétédu Grand Paris)制定了一种示范性的挖掘物管理业务策略。在当前的监管环境中,挖掘的材料具有废料的状态。该管理策略包括三个主要特征:土地的可追溯性,材料的回收利用以及通过优化利用内河和铁路运输来减轻对环境的危害。对于创新以及特定合同工具和技术的开发,将保留重要角色。南部15号线合同的开始工作将使法国巴黎大饭店的战略得以不断完善。

著录项

  • 来源
    《Travaux》 |2017年第938期|27-27|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号