首页> 外文期刊>Travaux >DRIVEN PILE FOUNDATIONS OF EXCEPTIONAL LENGTH FOR THE WOMEY VIADUCT AT COTONOU, IN BENIN
【24h】

DRIVEN PILE FOUNDATIONS OF EXCEPTIONAL LENGTH FOR THE WOMEY VIADUCT AT COTONOU, IN BENIN

机译:贝宁科托努WOMEY导管架的超长驱动桩基础

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of the Womey viaduct in Benin is taking place in the very heterogeneous geotechnical context of the Djonou lagoon at Abomey Calavi. Due to successive collapses of the temporary access embankment for construction of the structure, the viaduct design and construction method had to be adapted to the area's peculiar geological and geotechnical context: a jetty bridge constructed using a pile-driving-guide launcher. Next, to overcome the residual geotechnical uncertainties which could not be resolved by additional geotechnical surveys, stringent pile driving monitoring was implemented to guarantee the load-bearing capacity of the foundations.
机译:贝宁Womey高架桥的建设是在Abomey Calavi的Djonou泻湖的非常异质的岩土工程环境中进行的。由于临时进出路堤连续倒塌以建造结构,因此高架桥的设计和施工方法必须适应该地区特殊的地质和岩土环境:使用打桩导向发射器建造的跳桥。接下来,为了克服剩余的岩土工程不确定性,而这些不确定性是无法通过其他岩土工程勘测解决的,因此实施了严格的打桩监控,以确保基础的承重能力。

著录项

  • 来源
    《Travaux》 |2019年第953期|36-36|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号