TOULOUSE METRO - DOUBLING THE LINE CAPACITY AT JEAN JAURÈS STATION - WORK SECTIONS 2 AND 7

机译:图卢兹地铁站-让·茹阿里斯站的线路通行能力提高一倍-工作第2和7部分

获取原文
获取原文并翻译 | 示例
           

摘要

For the project to double the capacity of Toulouse Metro Line A, Tisseo awarded to Bouygues Travaux Publics Régions France and Bouygues Bâtiment CSO a contract for improvement works on Jean Jaurès Station and for the creation of entrances to the esplanade. These works, in three phases (objectives 1, 2 and 3), are being carried out in the city centre and take into account the following constraints: road traffic, nearby adjoining buildings, the operation of the metro and user traffic flows. The project was therefore executed mainly by underpinning and very often at night.
机译:为了使图卢兹地铁A线的通行能力提高一倍,Tisseo授予法国Bouygues Travaux公共部门Régions和BouyguesBâtimentCSO一份合同,在JeanJaurèsStation进行改善工程,并设计了滨海大道的入口。这些工作分三个阶段(目标1,目标2和目标3)在市中心进行,并考虑到以下限制因素:道路交通,附近的相邻建筑物,地铁的运营和用户交通流量。因此,该项目主要是通过基础执行,并且通常在晚上执行。

著录项

  • 来源
    《Travaux》 |2019年第952期|50-50|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 fre
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号