首页> 外文期刊>Windpower engineering & development >Properly planning predictive and reliability-centered maintenance
【24h】

Properly planning predictive and reliability-centered maintenance

机译:正确规划以可靠性为中心的预测性维护

获取原文
获取原文并翻译 | 示例
           

摘要

Wind-power generation facilities must maintain reliable and dependable high-voltage systems and substations to maintain profitability. Grid reliability agencies, both national and regional, require maintenance testing. With the testing, it is good practice to ensure collector systems, transformers, and substations are all operating properly to avoid downtime and maintain consistent output. Some wind plants have chosen to stay online for extended periods and just wait until an outage occurs. However, availability and production are critical for generation facilities and a failure in the high-voltage system can take down the entire wind plant, not just one turbine.
机译:风力发电设施必须维护可靠且可靠的高压系统和变电站,以维持盈利能力。国家和地区的电网可靠性机构均要求进行维护测试。通过测试,优良作法是确保收集器系统,变压器和变电站都正常运行,以避免停机并保持一致的输出。一些风力发电厂选择长时间保持在线状态,只是等到发生故障为止。但是,可用性和生产对于发电设施至关重要,并且高压系统的故障会导致整个风力发电厂(不仅是一台涡轮机)瘫痪。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号