首页> 外文期刊>Wind Engineering >Excessive oven-voStage in long cabSes of large offshore windfarms
【24h】

Excessive oven-voStage in long cabSes of large offshore windfarms

机译:大型离岸风电场的长驾驶室中烤箱电压过高

获取原文
获取原文并翻译 | 示例
       

摘要

Large offshore windfarms are connected to onshore transmission grids through long high-voltage cables. When a large offshore windfarm goes into isolated operation with its high-voltage cable, for example by an action of the on-shore main-circuit breaker, there is a risk of significant over-voltage in the cable and the windfarm transformer. This paper analyses such a situation for both an existing and a planned large offshore windfarm in Denmark.
机译:大型海上风电场通过长高压电缆连接到陆上输电网。当大型海上风电场通过其高压电缆进入隔离运行时(例如,通过岸上主断路器的动作),存在电缆和风电场变压器明显过压的风险。本文分析了丹麦现有和计划中的大型海上风电场的情况。

著录项

  • 来源
    《Wind Engineering》 |2006年第5期|p. 375-383|共9页
  • 作者

    Vladislav Akhmatov;

  • 作者单位

    Energinet.dk, Transmission System Operator of Denmark, Fjordvejen I-I I, DK-7000 Fredericia, Denmark;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 风能、风力机械;
  • 关键词

  • 入库时间 2022-08-18 00:26:11

相似文献

  • 外文文献
  • 中文文献
  • 专利