Steel hybrid onshore wind towers installed with minimal effort: Development of lifting process

机译:以最小的努力安装钢制混合式陆上风塔:提升工艺的发展

获取原文
获取原文并翻译 | 示例
       

摘要

The total costs per produced kilowatt-hour for wind turbines depend significantly on the investment costs. Thereby, the tower is a relevant cost component, which depends on the chosen supporting structure, the material, and especially on the erection process. Here, an innovative erection process is presented in order to minimize the wind turbine installation, which leads to excluding the extra tall cranes for installing the wind turbines with hub heights over 180 m. In order to propose the innovative erection process, a new hybrid lattice/tubular supporting structure for the onshore wind turbines is designed. The connection component between the tubular part and lattice structure is proposed considering the support functionality for the new erection process. Furthermore, the building steps of the complete erection process are explained. The operational and the lifting loads on wind turbine supporting structure are estimated, and consequently, the erection process stages were analyzed. Finally, the finite element simulation are performed to specify the critical stresses in subcomponents of the supporting structure in each lifting stage and to show the feasibility of the erection process. Moreover, the most critical points and the stages are investigated and stress level in the supporting structure components is computed.
机译:风力涡轮机每生产千瓦时的总成本在很大程度上取决于投资成本。因此,塔架是一个相关的成本组成部分,它取决于所选的支撑结构,材料,尤其是取决于安装过程。在这里,提出了一种创新的安装过程,以最大程度地减少风力涡轮机的安装,这导致排除了用于安装轮毂高度超过180 m的风力涡轮机的超高起重机。为了提出创新的安装过程,设计了一种用于陆上风力涡轮机的新型混合格/管状混合支撑结构。考虑到新安装过程的支撑功能,提出了管状部件和格架结构之间的连接组件。此外,还介绍了整个安装过程的构建步骤。估算了风机支撑结构的运行载荷和起重载荷,并据此对安装过程进行了分析。最后,进行了有限元模拟,以指定每个提升阶段支撑结构的子组件中的临界应力,并证明了安装过程的可行性。此外,研究了最关键的点和阶段,并计算了支撑结构部件中的应力水平。

著录项

  • 来源
    《Wind Engineering》 |2018年第4期|335-352|共18页
  • 作者单位

    Institute for Sustainability and Innovation in Structural Engineering (ISISE), Department of Civil Engineering, University of Coimbra, Coimbra, Portugal;

    Institute of Steel Construction, RWTH Aachen University, Aachen, Germany;

    Institute of Steel Construction, University of Siegen, Siegen, Germany;

    Institute for Sustainability and Innovation in Structural Engineering (ISISE), Department of Civil Engineering, University of Coimbra, Coimbra, Portugal;

    Institute of Steel Construction, RWTH Aachen University, Aachen, Germany;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Wind turbine installation; wind tower self-erection; erection process;

    机译:风力发电机组安装;风塔自架设;架设工艺;