首页> 外文期刊>WET News >Lee Tunnel project gets Busy
【24h】

Lee Tunnel project gets Busy

机译:李隧道工程繁忙

获取原文
获取原文并翻译 | 示例
       

摘要

A Giant tunnelling machine has been lowered into a gigantic shaft, deeper than anything else in London to start digging the four-mile, £635M Lee Tunnel, which will prevent 16M tonnes of sewage entering the River Lee each year. The machine, called Busy Lizzie, is 8m in diameter and 120m long. The 800-tonne cutter head was the first piece of the drill lowered. Lee Tunnel, which is being built by joint venture MVB, is a huge engineering challenge that involves tunnelling through high groundwater pressures and passing through four miles of the most abrasive ground from the starting point at Beckton to the desti- nation at Abbey Mills. Busy Lizzie has been custom-designed to suit London's ground conditions.
机译:一个巨型隧道掘进机被放到一个巨大的竖井中,比伦敦的任何地方都深,开始挖掘长达四英里,耗资6.35亿英镑的李隧道,这将防止每年1600万吨的污水进入李河。这台名为Busy Lizzie的机器直径8m,长120m。 800吨铣刀头是降低的第一钻头。由合资公司MVB建造的Lee Tunnel是一项巨大的工程挑战,涉及通过高地下水压力进行隧穿,并从贝克顿起点到Abbey Mills目的地经过四英里的最具磨蚀性的地面。忙碌的Lizzie已根据伦敦的地面条件进行了定制设计。

著录项

  • 来源
    《WET News》 |2012年第1期|p.1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:20:43

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号