...
首页> 外文期刊>Water21 >Restoring the reservoir
【24h】

Restoring the reservoir

机译:恢复水库

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Tampa Bay Water officials are reviewing the qualifications of a number of design-build teams competing to renovate the agency's 15.5 billion gallon (59 billion litre) capacity CW Bill Young surface water reservoir.rnThe reservoir needs extensive repairs following discovery of cracks in its cement-soil interior lining during a drawdown in 2006.rnIn early August, Tampa Bay Water received statements of qualification from five potential contractors. The statements represent the first step in a two-stage procurement process to select the preferred design-builder. Final selection is expected to be made sometime in the first half of 2011.
机译:坦帕湾水务局官员正在审查众多设计建造团队的资格,这些团队竞相翻新该机构的155亿加仑(590亿升)CW Bill Young地表水库。rn在发现其水泥裂缝后,需要对水库进行大量维修,在2006年的一次亏损中,土壤内部衬砌。rn8月初,坦帕湾水务公司收到了来自五个潜在承包商的资质声明。这些声明代表了选择首选设计制造者的两阶段采购过程中的第一步。最终选择将于2011年上半年完成。

著录项

  • 来源
    《Water21》 |2010年第10期|P.17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号