首页> 外文期刊>Water asset management international >Tunisia water projectsupplies water tothousands
【24h】

Tunisia water projectsupplies water tothousands

机译:突尼斯水利工程提供数千

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Tens of thousands of people living in Tunisia's Guerdane and Remada regions have accessto clean drinking water following completion of an International Committee of the Red Cross Joint project with the national water board.A flood of refugees and migrants from Libya during 2011 puthuge pressureson scarce water resources. The project involved laying a 6.6km transmission lineand replacement/extension of 3km of pipe to connect existing wells to Remada's main reservoir, equipped with an automatic disinfection System. The target Population is 15,000 and the new network will help meet rising peak demand.
机译:在红十字国际委员会与国家水务委员会合作完成的国际项目完成后,突尼斯的瓜丹和雷马达地区成千上万的人获得了洁净的饮用水。2011年,来自利比亚的难民和移民泛滥,给水资源造成了巨大压力。 。该项目涉及铺设一条6.6公里的传输线,并更换/延伸3公里的管道,以将现有井与Remada的主水库连接,并配备了自动消毒系统。目标人口为15,000,新的网络将有助于满足不断增长的高峰需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号