...
首页> 外文期刊>Ux Weekly >News Briefs
【24h】

News Briefs

机译:新闻简报

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

It was widely reported January 17 that the High Court in Hiroshima, Japan revoked a lower court’s decision and ordered Shikoku Electric Power Co. (EPC) to suspend Unit 3 of the Ikata nuclear power plant in Ehime Prefecture. In its decision, the High Court determined that the Nuclear Regulation Authority’s (NRA) proposed rules and Shikoku EPC’s risk estimates regarding a potential eruption of the Mt. Aso volcano were inadequate. “Research on the active fault is insufficient and the Nuclear Regulation Authority’s judgment that it is not a problem is incorrect,” said Presiding Judge Kazutake Mori. “(Shikoku Electric) needs to also take into account less than catastrophic eruptions at the caldera of Mt. Aso.”
机译:据1月17日广泛报道,日本广岛高等法院撤销了下级法院的裁决,并下令四国电力公司(EPC)暂停爱媛县Ikata核电站的3号机组。高等法院在判决中确定,核监管局(NRA)提出了规则以及Shikoku EPC关于可能爆发的Mt的风险估计。阿苏火山不足。主持审判的Kazutake Mori法官说:“对活动故障的研究还不够,核监管局对这不是问题的判断是不正确的。” “(四国电气公司)还需要考虑到山顶破火山口的灾难性爆发。阿苏。”

著录项

  • 来源
    《Ux Weekly》 |2020年第3期|2-8|共7页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号