首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Peregrino 2 start-up stalled off Brazil
【24h】

Peregrino 2 start-up stalled off Brazil

机译:Peregrino 2启动脱掉巴西

获取原文
获取原文并翻译 | 示例
       

摘要

EQUINOR has confirmed that start-up of phase two of its Peregrino field development project off Brazil has been delayed until next year due to work disruption caused by the Covid-19 pandemic. The latest phase of the heavy oil field scheme being developed by the Norwegian operator in the Campos basin was previously due to be launched by the end of this year. However, chief executive Eldar Saetre said late last week that the planned start-up has now been pushed back into 2021, with the scheme being the latest of the company's projects around the world to fall victim to delays caused by the corona-virus crisis that has led to logistical issues in manning installations and cutbacks due to low oil prices.
机译:Equinor已经证实,由于Covid-19大流行造成的工作中断,在巴西逐步延迟了巴西第二阶段的Peregrino现场开发项目的启动。挪威运营商在Campos盆地开发的重油场计划的最新阶段以前由于今年年底推出。然而,首席执行官Eldar Saetre上周迟到了,计划的初创公司现已推回2021年,该计划是该计划的最新目的,将受害者抵消由科罗长病毒危机造成的延误造成的延误由于油价低,导致曼宁装置和削减的后勤问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号