首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Covid-19 forces delay to India floater tender
【24h】

Covid-19 forces delay to India floater tender

机译:covid-19延迟延迟印度浮动招标

获取原文
获取原文并翻译 | 示例
       

摘要

HARDY Exploration & Production India (HEPI) has further delayed the bid submission date until mid-June for a floating production vessel for its PY-3 field in the Cauvery basin off India's east coast. Bids for the floating production vessel were earlier due for submission during the first quarter of this year, but the submission has been delayed on a number of occasions due to the coronavirus outbreak and low oil prices, two people familiar with the tender process told Upstream.
机译:Hardy探索和生产印度(HEPI)进一步推迟了竞标日期,直到6月中旬,为印度东海岸的Cauvery盆地的PY-3领域浮动生产船只。浮动生产船舶的出价早些时候提交了今年第一季度的提交,但由于冠心病爆发和低油价,这一提交延迟了许多场合,两个人熟悉招标过程中的上游。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号