首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Shell's Prelude FLNG set to be offline for months
【24h】

Shell's Prelude FLNG set to be offline for months

机译:Shell's Prelude FLNG设置为离线几个月

获取原文
获取原文并翻译 | 示例
       

摘要

SHELL is facing months of waiting before being able to bring its giant Prelude floating liquefied natural gas project off Western Australia back into production, having shut down the field more than three months ago due to safety concerns. The Anglo-Dutch supermajor switched off the production taps at the FLNG unit on 2 February due to issues with the electrical generators. The shutdown occurred just days after Shell was directed by the Australian regulator, the National Offshore Petroleum Safety & Environmental Management Authority (Nopsema), to fix safety procedures.
机译:壳牌正面临几个月的等待,然后能够将其巨型前奏漂浮液化天然气项目从西澳大利亚返回生产,超过三个月前关闭了该领域,由于安全问题。 Anglo-Dutch Supermajor由于发电机的问题,2月2日在FLNG单元上关闭了PLNG单元的生产水龙头。 Shell由澳大利亚监管机构,全国海上石油安全与环境管理局(Nopsema)导演的壳牌发生后,发生了停机时间,以修复安全程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号