首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >SBM pledges to stick to schedule on floaters
【24h】

SBM pledges to stick to schedule on floaters

机译:SBM承诺坚持在漂浮物上安排

获取原文
获取原文并翻译 | 示例
       

摘要

SBM Offshore has outlined plans to keep key floater projects close to their original schedules, despite the headwinds caused by the coro-navirus pandemic and the collapse in oil prices. The Dutch contractor said it expects to deliver the Liza Unity floating production, storage and offloading vessel on time from Singapore's Keppel Shipyard, despite the coronavirus outbreak all but halting work in Singapore fabrication yards. The Liza Destiny FPSO will go to the ExxonMobil-operated Liza field in Guyana. SBM chief operating officer Philippe Barril told analysts in a quarterly earnings call: "The hull was delivered out of China ahead of time and, before the stoppage in Singapore The modules fabrication was equally ahead. So we are closely interacting with the customer and our current assessment is that we would target on-sched-ule delivery."
机译:SBM Offshore概述了计划将关键浮动项目保持靠近其原始时间表,尽管Coro-Navirus大流行和油价崩溃造成的逆风。荷兰承包商表示,尽管Coronavirus爆发的所有内容在新加坡制造码中暂停工作,但荷兰承包商将随时了解Liza Unity浮动生产,储存和卸载船只。 Liza Destiny FPSO将在圭亚那的埃克森美孚运营的Liza领域。 SBM首席运营官Philippe Barril在季度收益中告诉分析师:“船体在新加坡停止之前,在新加坡的停工前,模块的制造在同样前进。所以我们与客户密切互动和我们的当前互动评估是我们将达到调度-ULE交付。“

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号