...
首页> 外文期刊>Pipeline and underground utilities construction >PLCA Rescheduled PLCA Convention Set for August
【24h】

PLCA Rescheduled PLCA Convention Set for August

机译:普拉被重新安排的PLCA公约设定为八月

获取原文
获取原文并翻译 | 示例
           

摘要

The year 2020 and even through the first half of 2021 was a period of challenges and adjustments for members of the Pipe Line Contractors Association. The worldwide Covid 19 pandemic limited association events and forced adjustments on every level, said Kelly Osborn, PLCA president from 2020 to February 2021. Overall, the pipeline construction industry has been deeply impacted by the pandemic. However, there are many positive accomplishments to report. "Fortunately, as essential work, some construction was able to move forward," said Osborn. "Most notably, TC Energy's Buckeye Xpress was successfully completed in 2020, and we kicked off construction on Enbridge's Line 3 Replacement Project. "The PLCA negotiated project labor agreements for both the Buckeye Xpress and the Line 3 Project ensuring that the work would be performed by PLCA members - union contractors with the highest level of attention to safety, quality, environmental compliance and community support."
机译:2020年甚至在2021年上半年甚至是管线承包商协会成员的挑战和调整时期。 全球Covid 19大流行有限的协会事件和强迫调整,每个级别都在2020年至2月2021年到2021年。总体而言,管道建筑业深受大流行影响的影响。 但是,报告有许多积极的成就。 “幸运的是,作为必要的工作,一些建筑能够前进,”奥斯伯斯说。 “最值得注意的是,TC Energy的Buckeye Xpress于2020年成功完成,我们踢出了Enbridge的第3行更换项目的建设。”PLCA协商的Buckeye Xpress和第3行项目的项目劳动协议,确保了该工作将进行工作 由PLCA成员 - 联盟承包商具有最高关注的安全,质量,环境遵守和社区支持。“

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号