Solving a Puzzling Project

机译:解决一个令人费解的项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Drill a pilot hole; enlarge the bore hole by backreaming as necessary; prepare product for pull-in at the exit end; pull it back through the pilot hole - the basic steps of a horizontal directional drilling (HDD) installation. But what if there is no place to lay out and prepare the product for pull-in? That was the problem faced by Pacific Gas & Electric (PG&E) for a portion of the company's L-109 pipe replacement program in an area near Redwood City, Ca., where construction was subject to strict environmental restrictions, limited work space and a short, six-month window to complete.
机译:钻一个导向孔;必要时通过扩孔扩大钻孔;准备产品以在出口端插入;通过导向孔将其拉回-水平定向钻孔(HDD)安装的基本步骤。但是,如果没有地方可以布置和准备产品进行拉入怎么办?这就是太平洋天然气和电力公司(PG&E)在加利福尼亚州雷德伍德城附近地区进行L-109管道更换计划的一部分所面临的问题,该地区的建设受到严格的环境限制,有限的工作空间和短暂的建造时间,六个月的窗口完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号