首页> 外文期刊>Underground construction >$425 Million Cheyenne Plains Project: On Time & Under Budget
【24h】

$425 Million Cheyenne Plains Project: On Time & Under Budget

机译:4.25亿美元的夏安平原项目:按时完成,预算不足

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Cheyenne Plains Gas Pipeline Co., a sub-sidiary of El Paso, is building a large-diameter pipeline that will carry natural gas from the prolific production basins in the Rocky Mountains to Mid-Continent Scheduled to become operational in 2005, the 380-mile, $425 million pipeline is being built by two Houston-based contractors - Associated Pipe Line Construction Inc. and U.S. Pipeline Inc. Within a few months, the project is near-ing the testing and commissioning phase. Once completed, the 36-inch diameter pipeline will extend from El Paso's compressor station in Carr, CO, to Greensburg, KS, where it will interconnect with other Midwest pipelines including Northern Natural Gas, ANR, Panhandle Eastern, Williams, Natural Gas Pipeline Co. and Mid-Continent Market Center.
机译:埃尔帕索(El Paso)的子公司夏延平原天然气管道公司(Cheyenne Plains Gas Pipeline Co.)正在建设一条大口径管道,该管道将把天然气从落基山脉的多产生产盆地运送到中陆地区。预定于2005年投入运营的380-英里,由两个位于休斯敦的承包商-联合管道建设公司和美国管道公司正在建设4.25亿美元的管道。在几个月内,该项目接近测试和调试阶段。一旦完成,这条直径为36英寸的管道将从埃尔帕索位于科罗拉多州卡尔的压缩机站延伸至堪萨斯州格林斯堡,并与其他中西部管道互连,包括北部天然气,ANR,Panhandle Eastern,威廉姆斯,天然气管道公司。和中欧市场中心。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号