...
首页> 外文期刊>Pipeline & utilities construction >Michels Uses HDD Intersection Technology To Tackle Sensitive Water Crossings
【24h】

Michels Uses HDD Intersection Technology To Tackle Sensitive Water Crossings

机译:米歇尔(Michels)使用HDD交叉技术解决敏感的过水问题

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Pacific Gas & Electric began construction on the second stage of a new natural gas transmission main in a flood prone delta area west of Stockton, CA, during the summer of 2007.rnThe Line 57C Reliability project called for the installation of a new 6.4 mile, 24-inch diameter high-pressure gas transmission main. The new pipeline would connect PG&E's McDonald Island gas storage field, located 10 miles west of Stockton, with an existing natural gas transmission pipeline network just east of Brentwood, CA.rnThe new connection depends upon a 19-mile pipeline L-57B, built in 1974, utilizing conventional cut and cover. That line is buried just a few feet below grade level. This old line traverses beneath sensitive levees and rivers within this protected river delta. In 1983, one of the levees was breached, completely flooding nearby Mildred Island.
机译:太平洋天然气电力公司(Pacific Gas&Electric)于2007年夏季在加利福尼亚州斯托克顿以西易发洪水的三角洲地区开始建设新的天然气传输干线的第二阶段。57C线可靠性项目要求安装一个新的6.4英里,直径为24英寸的高压气体输送总管。新的管道将连接PG&E位于斯托克顿以西10英里的麦当劳岛储气库和位于加利福尼亚州布伦特伍德以东的现有天然气传输管道网络。新的管道连接取决于19英里长的L-57B管道,该管道位于1974年,采用传统的切割和覆盖方法。那条线被埋在坡度以下几英尺的地方。这条旧线在受保护的河三角洲内的敏感堤坝和河流下方穿行。 1983年,其中一条防洪堤被破坏,彻底淹没了米尔德雷德岛附近。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号