首页> 外文期刊>Underground Construction >Hand-Tunneling In D.C.
【24h】

Hand-Tunneling In D.C.

机译:D.C.中的手动隧道

获取原文
获取原文并翻译 | 示例
           

摘要

Extending a new sewer line in Washington, D.C. has posed some serious challenges to local contractor Anchor Construction, particularly when district officials recently opted to locate the new baseball stadium for the Washington Nationals major league team in an area where new development has been welcomed. The location is on the west side of South Capital, just north of the Anacastia River bridge. The site is adjacent to the Navy Yards and the 0 Street Pumping Station. Most of the development created by its new location is occurring to the north, past M Street. This development is further supported by the Metro Station whose entrance is at M Street and New Jersey (the underground station extends a full block to the west and is directly under the new sewer alignment). The development created by the stadium has resulted in new office buildings and 3,000 new condominium units in nine new buildings. In order to accommodate this development, the sewer infrastructure in the area had to be improved, upsized and extended. M Street had to be crossed with a 21-inch diameter line.
机译:扩展华盛顿特区的新下水道管线给当地承包商Anchor Construction带来了一些严峻挑战,特别是当地区官员最近选择在欢迎新开发项目的地区为华盛顿国民大联盟球队找到新的棒球场时。该位置在南部首都的西侧,就在Anacastia河大桥的北边。该地点毗邻海军船坞和0 Street Pumping Station。由其新位置创建的大多数开发都发生在北部,即M街。地铁站的入口位于M街和新泽西州(地铁站向西延伸了整块街区,并直接位于新的下水道轴线下方),进一步支持了该开发项目。体育场创造的开发成果带来了新的办公大楼和9座新大楼中的3,000个新公寓单元。为了适应这一发展,该地区的下水道基础设施必须加以改善,扩大和扩展。 M街必须与21英寸直径的线交叉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号