首页> 外文期刊>Pipeline and underground utilities construction >Slide Rail System Keeps Lift Station Project On Time, Budget
【24h】

Slide Rail System Keeps Lift Station Project On Time, Budget

机译:滑轨系统使升降机站项目按时,按预算进行

获取原文
获取原文并翻译 | 示例
       

摘要

Evans Construction Co. of Jackson, WY, recently installed a new eight-foot diameter lift station in the suburbs near Jackson Hole. Due to the limited space and multiple adjacent structures and cross-utilities, Evans needed a non-traditional shoring system. Evans was originally contracted to replace the pumps for an overworked six-foot diameter lift station. But when it was discovered that the lift station was leaking, city officials and engineers decided to contract Evans to install a new lift station with new pumps. Evans also installed two manholes to reroute the sewer line to the new lift station.
机译:怀俄明州杰克逊市的埃文斯建筑公司(Evans Construction Co.)最近在杰克逊霍尔附近的郊区安装了一个直径8英尺的新升降机站。由于空间有限以及多个相邻的结构和跨实用程序,Evans需要一个非传统的支撑系统。埃文斯最初是与一家劳累过度的六英尺直径的提升站签订合同更换泵的。但是,当发现升降机站泄漏时,市政官员和工程师决定与Evans签约,以安装带有新泵的新升降机站。埃文斯还安装了两个检修孔,以将下水道管线改道至新的升降机站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号