...
首页> 外文期刊>Underground Construction >Increasing accountability with the Datalogger~® 5 and Datalogger Vault™
【24h】

Increasing accountability with the Datalogger~® 5 and Datalogger Vault™

机译:使用Datalogger〜®5和Datalogger Vault™加强问责制

获取原文
获取原文并翻译 | 示例
           

摘要

McElroy's latest technology in data collection improves productivity in construction of fused pipeline at oil sands jobsite Earlier this year, a pipeline was being built in the Athabasca toil sands of Alberta requiring hundreds of polyethylene pipe fusions to be performed within a very short timeframe. Being able to demonstrate that the work was accurately performed was more important than ever before to ensure the safety and longevity of the pipeline. In today's regulatory climate, this level of accountability is often a mandate.
机译:McElroy的最新数据收集技术提高了油砂作业现场熔融管道建设的生产率,今年早些时候,在艾伯塔省阿萨巴斯卡(Athabasca)人工砂建造的管道需要在很短的时间内进行数百次聚乙烯管道熔融。为了确保管道的安全性和寿命,能够证明工作已经正确执行比以往任何时候都更为重要。在当今的监管环境中,这种责任级别通常是强制性的。

著录项

  • 来源
    《Underground Construction》 |2014年第10期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号