Pipe Ramming Proves Golden for Colorado HDD Project

机译:管道夯实证明科罗拉多硬盘项目金牌

获取原文
获取原文并翻译 | 示例
           

摘要

Over the years, the two methods have teamed up on countless pipeline installation projects for many different industries. Recently, pipe ramming played a key role in the HDD installation of a gas transmission main in Colorado. In the heart of what many would consider beer country, Golden, CO, a pipe ramming HDD assist technique helped facilitate the installation of a 20-inch diameter gas main under a highly traveled roadway adjacent to several important water sources. BTrenchless (a division of BT Construction, Henderson, CO) was contracted by Global Underground Corp., Colorado Springs, CO, to install a conductor barrel casing through pneumatic pipe ramming in an effort to manage drilling fluid. According to BTrenchless Project Manager Chris Gray, the installation was not without challenges. "We needed to take into consideration a variety of issues, from the soil conditions to layout of the job site itself, to make this project successful. But in the end, we were very pleased with the results," Gray said. In order to install the 48-inch diameter conductor barrel casing, BTrenchless used a 24-inch diameter Grundoram Taurus pneumatic pipe ramming system from trenchless equipment manufacturer TT Technologies, Aurora, IL.
机译:多年以来,这两种方法已联合用于许多不同行业的无数管道安装项目中。最近,在科罗拉多州的天然气输送总管的HDD安装中,管道夯实起了关键作用。在许多人认为的啤酒之乡的心脏地带,科罗拉多州戈尔登,管道夯实HDD辅助技术有助于在与几个重要水源相邻的交通繁忙的巷道下安装直径20英寸的天然气总管。 BTrenchless(科罗拉多州亨德森市BT建筑公司的一个部门)与科罗拉多州科罗拉多斯普林斯市的Global Underground Corp.签订了合同,通过气动夯管安装导体筒套管,以管理钻井液。根据BTrenchless项目经理Chris Gray的说法,安装并非没有挑战。格雷说:“我们需要考虑从土壤条件到作业现场本身的各种问题,以使该项目成功。但是最后,我们对结果感到非常满意。”为了安装直径为48英寸的导体筒套管,BTrenchless使用了伊利诺伊州奥罗拉无沟槽设备制造商TT Technologies的直径为24英寸的Grundoram Taurus气动管道夯打系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号