首页> 外文期刊>Underground Construction >Despite Heavy Flooding, Contractor Bore Salvages Water Line
【24h】

Despite Heavy Flooding, Contractor Bore Salvages Water Line

机译:尽管洪水泛滥,承包商的打捞打捞水线

获取原文
获取原文并翻译 | 示例
           

摘要

Construction in Lathrop, MO, specializes in water main projects and contracts. In fact, about one-third of the company's business is dedicated to maintaining more than 20 different municipal water systems across northwest Missouri, which means Decker Construction handles the installation and repairs for each system. Last May, the company got an urgent call from Caldwell County Public Water Supply District (PWSD) 3, a municipal customer in Braymer, MO. Weeks of heavy rain near Kingston had caused Shoal Creek to flood several times and had finally scoured out the embankments, washing out the existing 6-inch water main under the creek. More than 2,500 residents would be without water if the situation was not resolved within 48 hours, when the reserves in the water towers would be depleted.
机译:密苏里州拉斯洛普的建筑专业从事水利工程和合同。实际上,该公司约三分之一的业务致力于在密苏里州西北部维护20多个不同的市政供水系统,这意味着Decker Construction负责处理每个系统的安装和维修。去年五月,该公司接到密苏里州布雷默市市政用户Caldwell County Public Water Supply District(PWSD)3的紧急电话。金斯敦(Kingston)附近几周的大雨使肖尔克里克(Shoal Creek)泛滥了好几次,并最终冲刷了堤防,冲刷了小河下面现有的6英寸水管。如果在48小时之内无法解决问题,超过2500名居民将缺水,届时水塔中的储备将被耗尽。

著录项

  • 来源
    《Underground Construction》 |2016年第1期|50-51|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号