【24h】

TUCA PART TWO

机译:图卡第二部分

获取原文
获取原文并翻译 | 示例
       

摘要

THE TUNNELLING AND UNDERGROUND Construction Academy (TUCA) was set up by Crossrail Limited to bridge the skills gaps it knew it would encounter along the way. But while the Crossrail project itself is nearing its conclusion, there is still plenty of life in its training academy. The GBP 13M (USD 16.9M) academy in llford, east London, was part-funded by a GBP 5M (USD 6.5M) grant from the Skills Funding Agency and by sponsorship from major contractors and opened its doors in September 2011. This first incarnation followed Crossrail's in-depth skills forecasting exercise, which looked at both the demand for and the availability of the expertise required to deliver the whole project. The forecast flagged up some skills gaps in the first phase of the project - the tunnel construction itself.
机译:Crossrail Limited成立了隧道与地下建筑学院(TUCA),以弥补其在沿途遇到的技能差距。但是,尽管Crossrail项目本身已接近尾声,但其培训学院的生活仍然充裕。这座位于伦敦东部llford的耗资1300万英镑(合1690万美元)的学院,部分由技能培训局提供的500万英镑(合650万美元)赠款以及来自主要承包商的赞助,于2011年9月开业。化身之后,Crossrail进行了深入的技能预测练习,该练习考察了交付整个项目所需的专业知识的需求和可用性。该预测标志着项目第一阶段(隧道建设本身)在技能上的一些不足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号