The 2,500m-long tunnel was constructed partially through the most recent volcanic deposit in BC, including a zone of unconsolidated soils. An originally unplanned grouting program was designed and implemented to manage unexpected water inflows and consolidate largely unknown materials, which differed greatly from deposits encountered during various initial project investigations. From challenging geology, to some of the strictest environmental requirements faced by a run-of-river project in the province of British Columbia, the owner, engineer and contractor collaborated as a team to come up with solutions and manage each, and sometimes daunting challenge. The tunnel was delivered in time for commercial operations and overall considered a great achievement and success.
机译:这条长达2,500m的隧道是部分通过不列颠哥伦比亚省最新的火山沉积物建造的,包括一个未固结的土壤带。设计和实施了最初计划外的注浆程序,以管理意想不到的水流入并整合很大程度上未知的物料,这些物料与各种初始项目调查中遇到的沉积物有很大不同。从具有挑战性的地质,到不列颠哥伦比亚省的跨河项目所面临的最严格的环境要求,业主,工程师和承包商共同协作,提出解决方案并管理每个挑战,有时甚至是艰巨的挑战。该隧道按时交付用于商业运营,总体而言是巨大的成就和成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号