首页> 外文期刊>Tunnels & tunnelling international >Redpath completes another record-breaking raise bore
【24h】

Redpath completes another record-breaking raise bore

机译:RedPath完成了另一个唱片升高的钻孔

获取原文
获取原文并翻译 | 示例
           

摘要

CANADA - Redpath Raiseboring has announced that it has completed the longest raisebore in the Northern Hemisphere and all of the Americas. The record-breaking feat took place on 25 May at Kirkland Lake Cold's Macassa Mine at North Bay, Ontario, Canada. At 1,010m long, the bore formed part of a pair of 3.66m-diameter ventilation shafts (one on top of the other) extending from the surface down to mine level 5617 (1,712m). Accomplished in two stages, two Redpath-designed machines drilled concurrently, one underground, the other on the surface to complete individual ventilation raises of 660m and 1,010m respectively.
机译:加拿大 - Redpath Rainsboring宣布它已经完成了北半球和所有美洲的最长的雨架。 在加拿大安大略省北湾的Kirkland Lake Cold的Macassa Mine举行了纪录突发的壮举。 在1,010米长,孔形成一对3.66m直径的通风轴(另一个在另一个上的通风轴(一个在另一个上),从表面延伸到矿山水平5617(1,712M)。 在两个阶段完成,两台红径设计的机器同时钻,一个地下,另一个在地面上,完成各个通风率为660米和1,010米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号